Hi There,
I was generating the MsProject with sample tasks and tasks from the project are belongs to Nov’18. But when I open the generated project, timeline shows me as Oct’09 as shown in attached picture.
image.png (6.5 KB)
And here is the generated output file:
Regards,
Srinivas