Hi There,

I was generating the MsProject with sample tasks and tasks from the project are belongs to Nov’18. But when I open the generated project, timeline shows me as Oct’09 as shown in attached picture.

image.png (6.5 KB)

And here is the generated output file:

Regards,
Srinivas

Sorry, I was able to make it work by applying the dates to project. Thanks.

@srinudhulipalla