Resource Sheet
|
|
4
|
636
|
April 4, 2016
|
|
Name Length limitations on Resource [Name]
|
|
1
|
449
|
December 8, 2015
|
|
Is 2010 support in?
|
|
1
|
341
|
June 23, 2010
|
|
Open file accross network passing user credentials
|
|
1
|
456
|
August 15, 2009
|
|
Dot Net 6.0 support
|
|
4
|
522
|
December 17, 2021
|
|
Difference when updating project work completed up to the specified date
|
|
6
|
884
|
December 17, 2021
|
|
Problem with TaskLinks and FixedWork Tasks
|
|
1
|
376
|
June 24, 2014
|
|
Sample code of adding child tasks to a parent task?
|
|
3
|
561
|
November 21, 2014
|
|
Saving new project causes null pointer exception
|
|
6
|
557
|
November 25, 2021
|
|
Open Project docs where full path in longer than 260 characters => does not work
|
|
6
|
498
|
November 23, 2021
|
|
System.OverflowException: TimeSpan overflowed because the duration is too long
|
|
5
|
949
|
November 19, 2021
|
|
ASPOSE Tasks 21.6.0.0 unable to read P6 file
|
|
2
|
585
|
November 19, 2021
|
|
ECDCTS-7965: Is there an equivalent method to setShowProjectSummaryTask()?
|
|
3
|
405
|
November 17, 2021
|
|
Failed to set calendar working time
|
|
1
|
822
|
August 1, 2016
|
|
Modifying TimePhased Data and saving into MPP file
|
|
4
|
595
|
November 1, 2021
|
|
Wrong calculation of duration
|
|
6
|
612
|
October 27, 2021
|
|
Aspose Tasks - Get or Set Auto Schedule or Manual Schedule *per task
|
|
10
|
717
|
October 12, 2021
|
|
TotalSlack not returning the proper values
|
|
10
|
850
|
September 21, 2021
|
|
Aspose.Tasks 21.5 is unable to read MPP file in 2016 format
|
|
2
|
390
|
September 20, 2021
|
|
The start time should be not greater than the finish one, exception when creating project from Primavera .xer file
|
|
9
|
746
|
September 20, 2021
|
|
Aspose.Task save to PDF rendering issue
|
|
50
|
2176
|
September 20, 2021
|
|
Project reading exception using MspDbSetting
|
|
1
|
347
|
September 20, 2021
|
|
P6 XML import Task Status Problem
|
|
6
|
670
|
August 26, 2021
|
|
IsOverallocated flag is True for tasks that are not overallocated for project plans
|
|
9
|
540
|
August 16, 2021
|
|
Resource Over Allocation not updated for entire row
|
|
5
|
685
|
August 16, 2021
|
|
Aspose.Tasks Index was outside the bounds of the array
|
|
2
|
599
|
August 16, 2021
|
|
StackOverflowException when creating a Project from Primavera XML
|
|
10
|
741
|
August 16, 2021
|
|
Insert Blank Row in between every tasks
|
|
10
|
681
|
July 26, 2021
|
|
Setting Task Duration w/ Resource not recalculating correctly for first Task
|
|
4
|
863
|
July 26, 2021
|
|
FIPS not compatible with mpp file
|
|
1
|
427
|
July 7, 2021
|